Sidotti Museum Construction Report – June 12
- yakustudio2020
- Jun 12
- 1 min read
Updated: Jun 24
June 12, 2025
We carried out the work of pouring concrete into the foundation formwork. Before
starting, we all faced the mountains and gave a respectful bow, offering salt and
shochu to seek the blessing of Yakushima’s Mountain gods.
The team was an international mix of Americans, Portuguese, New Zealander, and
Japanese. Together, they formed an efficient flow: transporting the concrete from
the mixer in wheelbarrows, carefully pouring it into every corner of the wooden
forms, compacting it with a vibrator for strength, and finally leveling the surface with
precision. It was truly a collaborative effort.
Comments